Customization New design european styld 40 feet steel framed prefab luxury container houses office China modular
What is the specification?
1 | Size: 11850mm x 2250mm x 2500mm (external) |
2 | Floor Panel |
14# Channel steel main beams (galvanized) |
Steel tube cross member |
ISO shipping container corners |
15 mm plywood |
Floor 18mm |
3 | Roof panel |
Galvanized cold-formed steel roof frame with gutter |
Steel tube cross member |
ISO shipping container corners |
Painting |
75mm Glass wool insulation |
4 | welding pillar |
Galvanized square pipe pillar, well painted |
Linked with roof and floor with welding |
5 | Wall |
Galvanized square pipe and container plate |
welding |
6 | Door (875mm x 2000mm) |
Aluminum |
Aluminum door frame |
Safety lock, stainless steel |
7 | Window (875mm x 1000mm) |
Aluminum frame |
Double tempered glass |
Fly wire |
8 | Electronics, water supply and drainage are according to the local law (additional cost) |
9 | Furniture and appliance are customized-made to your requirements(additional cost) |
How is the indoor ?



Indoor structure show

FAQ
Q: Can you make color order ?
A: Yes. We can according to your requirements.
Q: Are you a factory or trading company ?
A: We are a factory.
Q: Where is your factory located?
A: Our factory is located in YingKou City, LiaoNing Province, China. All our clients,from home or
abroad, are warmly welcome to visit us !
Q: How do you guarantee the quality of the products?
A: Strict product quality, unqualified resolute don't factory.This is the tenet of our
factory
Every one of our products have strict testing procedures, must be 100% quality
assurance.
Our Services
How do order?
Step 1: Tell us your requirements |
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative |
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract. |
Step 4: Advanced payment and production |
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract. |
Step 6: Balance payment and shipping |
Step 7: Handing Shipping files to help clients get goods from transporter in time. |
Step 8: Clients get goods and go into warranty time. |
How is the payment ?
T/T( 50% by T/T in advance, the rest 50% to be paid by T/T after you inspect the Product in seller's factory before delivery )
Our customers from all over the world.


